APPLICATION OF SAND DRAIN FOR SOFT SOIL IMPROVEMENT AT THE ASH YARD BERM – VUNG ANG II BOT THERMAL POWER PLANT PROJECT
Abstract: the Ash Yard Berm (AYB) of the Vung Ang II BOT Thermal Power Plant Project is to be constructed in an area characterized by complex engineering geological conditions. Four weak soil layers, with thicknesses ranging from 2.4 m to 6.9 m, are distributed directly beneath the ground surface, extending to a depth of approximately 14.6 m. Given the substantial height of the berm, the presence of these soft soil layers, of considerable thickness and shallow distribution, poses risks of foundation failure and excessive settlement at the AYB, potentially exceeding the allowable limits set by current Vietnamese construction standards. Therefore, soft soil improvement is required. Based on the collected geotechnical data, the analysis was conducted using GeoStudio software, applying the bishop method to calculate the stability factor, and settlement analysis was performed in MS Excel based on Terzaghi’s consolidation theory. This paper synthesizes and analyzes the results of the geotechnical investigation at the Ash Yard area and presents the design outcomes for soft soil improvement using the Sand Drain method in the AYB area of the Vung Ang II BOT Thermal Power Plant Project. The study results demonstrate that the Sand Drain method is an effective and technically appropriate solution that meets all soft soil improvement requirements for the AYB, in compliance with Vietnamese construction standards.
Keywords: soft soil improvement, sand drain, Vung Ang II BOT thermal power plant.
https://doi.org/10.24412/2712-8849-2025-788-522-535
1. INTRODUCTION. The Vung Ang II BOT Thermal Power Plant Project (VAII TPP) will comprise two 660 MW imported coal-fired generating units. The project site is in Hai Phong Village, Ky Loi Commune, Ky Anh, Ha Tinh Province (see Figure 1). The ash yard will be constructed in a designated area intended for the collection of slurry ash generated by the plant. The power plant is expected to produce approximately 380,000 tons of fly ash and bottom ash annually. Ash will be transported to the ash yard through a wet ash slurry system and by truck. The total area of the ash yard is approximately 15 hectares. Stage 1 of the ash yard will be developed with a berm height of approximately +16 m, designed to store 380,000 tons of ash per year over a continuous period of about three years. The design will also accommodate the Owner’s plan to expand the ash yard’s capacity. Stage 2 will be constructed above Stage 1, raising the berm height to +23 m, allowing for the storage of an additional two years’ worth of ash [13].Fig. 1. Location of the project site in Hai Phong Village, Ky Loi Commune,Ky Anh, Ha Tinh Province, Vietnam [14].The first stage of the ash yard berm has a total length of 1,315 m, enclosing a storage area of approximately 10.7 ha, measured at the berm’s centerline. The top elevation of the berm in this stage is +16.0 m. On the southern side, the berm is constructed along a hillside and near an access road, where geological conditions are relatively favorable. In contrast, the northern, eastern, and western sides of the berm have a base elevation of approximately +2.0 m, where the geological conditions are less favorable due to the presence of soft soil layers. These weak soils at the berm foundation will be excavated and replaced with suitable compacted fill material to ensure stability [13] (see Figure 1).The technical specifications of the ash yard berm are as follows [14] (see Figure 2):Berm structure: Compacted soil with a compaction coefficient, k = 0.95.Dimensions (Length × Width): 1,315 m × 5 m.Top elevation: +16.0 m (Phase 1), +23.0 m (Phase 2).Bottom elevation: +1.21 m.Berm slopes: Internal slope (m₁) = 1.75, External slope (m₂) = 2.00.Fig. 2. Layout of the ash yard and cross-section I-I of the ash yard berm [13].The results of the geotechnical investigation reveal that the engineering geological conditions at the ash yard area are relatively complex. Stratigraphic analysis indicates the presence of four weak soil layers, composed primarily of clay with a bearing capacity of less than 100 kPa-ranging in thickness from 2.4 m to 6.9 m. These layers are distributed directly beneath the ground surface and extend to a depth of approximately 14.6 m. Given the considerable height of the berm, the presence of such weak soils, with both significant thickness and shallow distribution, poses a risk of foundation instability and excessive settlement at the Ash Yard Berm (AYB), potentially exceeding the allowable limits prescribed by current Vietnamese construction standards. As a result, it is essential to analyze, evaluate, and synthesize the geotechnical investigation findings for the ash yard area to select appropriate soft soil improvement solutions for the AYB of the project.2. MATERIALS AND METHODS.2.1. Materials.The study utilized geotechnical data obtained from references [9] to [14], including results from 20 boreholes drilled to depths ranging from 15 to 20 meters, as well as laboratory tests on the physical-mechanical properties of the soils. The borehole locations are illustrated in Figure 2. Key findings from the geotechnical investigations are summarized as follows:The Ash Yard area comprises two types of terrain - hills and plains, gradually sloping towards the sea. It features both erosional and depositional geomorphological characteristics.The engineering geological conditions are complex, consisting of 15 distinct soil and rock layers derived from marine and pre-mountainous sediments. These layers exhibit considerable variability in thickness, composition, and physical-mechanical properties. Notably, four weak clay layers with bearing capacities below 100 kPa were identified. These layers range in thickness from 2.4 to 6.9 meters and are found from the ground surface down to approximately 14.6 meters.Fig. 3. Geological map of the project area, scale 1:50,000 [8].Groundwater is shallow, with levels ranging from 0 to 1.8 meters below the surface. It belongs to the pressurized water type.A fault system trending in the northwest-southeast (NW-SE) direction crosses the area and may influence the stability of the berm along the hillside (Figure 3).Fig. 4. Geotechnical Section I-I (Layers No. 3 and No. 8,represented by pink and green, respectively, indicate weak clayey soils).Table 1. Physico-mechanical properties of soil layers at the locationof borehole BX02 in the geotechnical section I - I.2.2. Methods.With a large berm height, the existence of weak soil layers with a large thickness and shallow distribution can destabilize the foundation and cause large settlements at the Ash yard berm, exceeding the allowable settlement according to current Vietnamese construction standards. Soft soil improvement solutions should be applied for the foundation of the ash yard berm.Applicable codes and standards for the study: Standards applied for the study are shown in references from [1] to [8].Stability analysis: When performing a stability analysis of the Ash yard berm, the stability factor (Fs) is determined as the following formula according to Bishop’s method of slices [8], [15] (Figure 5):(1)(2)where:C: cohesion of soil, kPa,(: Internal friction angle, degree,b: The width of the slice, m,u: The pore water pressure at the bottom of the sliding arc, kPa,w: The weight of the slice, kN,α: Angle of inclination at the bottom of the sliding arc compared to the horizontal, degree.Fig. 5. Determination of stability factor FS according toBishop’s simplified method of slices [8], [15].Primary consolidation settlement calculation:Primary consolidation settlement Sc is calculated by the stratification and summation method. The depth of settlement calculation is determined by the depth at which σz ≤ 0.15σvz.The primary consolidation settlement Sc of the soils is calculated according to the following formula [8, 14]:- For normally consolidated or preconsolidated soil:(3)- For normally overconsolidated soil:(4) if +<(5)if +>where:: The initial void ratio of sublayer i,: The effective stress, effective overburden stress, and pre-consolidation stress at sublayer i, kPa.: The compression index of the sublayer i.Ci: The recompression index of the sublayer i.Hi: The thickness of the sublayer i, m.Total settlement calculation:The total settlement S consists of three components, which are the immediate settlement Si, primary consolidation settlement Sc, and secondary consolidation settlement Ss.The total settlement is estimated according to the following empirical formula [8]:S = m.Sc, with m = 1.1 - 1.4 (6)Other geotechnical parameters such as St, U, Uv, Uh, Δc, Tv, and Th are calculated according to instructions in [8] - TCCS 41:2022/TCDBVN.Softwares: Geostudio 2012 8.0 software with the Bishop method of calculating the stability factor and settlement calculation by MS Excel software based on Terzaghis consolidation theory.3. CALCULATION RESULTS.Based on the engineering geological conditions, stability and settlement calculations have been performed for the geotechnical section I-I, at the location of borehole BX02 (Figure 4).Based on the supplementary geotechnical investigations conducted by the Institute of Groundation & Underground Engineering in July and August 2022 [10-12], aimed at clarifying the engineering geological conditions, the physico-mechanical characteristics of the soil layers at borehole BX02 have been summarized in Table 1 above.3.1. Without soft soil improvement solutions.Fig. 6. Stability analysis at borehole BX02 locationwithout soft soil improvement solutions.Table 2. Stability analysis results for Case 1 - Normal conditions and estimated settlement of the ash yard berm without soft soil improvement solutions.The calculation results indicate that section B-B does not meet the required criteria for stability and allowable residual consolidation settlement, and therefore, soft soil improvement solutions are necessary.3.2. Soft soil improvement by Sand Drain.Justification for selecting the soft soil improvement solution for the Ash Yard Berm: The selection of a soft soil improvement solution must be based on several factors, including: geotechnical conditions of the foundation soil, area, depth, and location requiring improvement, required properties of the soil after improvement, availability of materials, expertise and experience of the soft soil improvement contractor, construction equipment, execution and maintenance conditions, as well as economic considerations and project schedule requirements.For the ash yard berm of the Vung Ang II BOT Thermal Power Plant project, given the high embankment height and the presence of two soft soil layers with considerable thickness, located at shallow depths and widely distributed, the sand drain is considered feasible and cost-effective. Therefore, it is a suitable solution for soft soil improvement in this case.Fig. 7. Berm stability calculation with Sand Drain D0.4m, L14.6m,@2.4m solution for case 1, case 2 and case 3 - phase 1 prepared by the authors.Table 3. Ash Yard Berm stability calculation (with Sand Drain D0.4m, L14.6m, @2.4m solution) for phase 1 prepared by the authorsTable 4. Ash Yard Berm settlement calculation (with Sand Drain D0.4m, L14.6m, @2.4m solution) for case 1 - phase 1 prepared by the authors.5. CONCLUSION.1. The geological strata in the project area are relatively complex, consisting of 15 soil and rock layers that differ in type and state/structure. Among them, layer 8 is soft soil layer with significant thickness, located at shallow depths and widely distributed. Due to the high embankment of the dike and the presence of the soft soil layer, considerable settlement and potential instability of the ash dump dike may occur. Therefore, an appropriate soft soil improvement solution is required to meet technical, feasibility, schedule, and economic requirements.2. The calculation results of soft soil improvement at location BX02 indicate that Sand Drain solution meets the technical, feasibility, and schedule requirements.3. The results of the stability analysis and estimated settlement after soft soil improvement for the ash yard berm indicate that the parameters of the Sand Drain solution satisfy the technical requirements specified in TCVN 8216:2018 and TCCS 41:2022/TCĐBVN, while also meeting the project schedule set by the Client.
Полная версия статьи PDF
Номер журнала «Вестник науки» № 7 (88) том 4
Ссылка для цитирования:
APPLICATION OF SAND DRAIN FOR SOFT SOIL IMPROVEMENT AT THE ASH YARD BERM – VUNG ANG II BOT THERMAL POWER PLANT PROJECT // Журнал «Вестник науки» от 27 июля 2025 г. № 7 (88) том 4. С. 522 - 535. 2025 г. ISSN 2712-8849 // Электронный ресурс: https://www.вестник-науки.рф/article/25265 (дата обращения: 29.11.2026 г.)
Альтернативная ссылка латинскими символами: vestnik-nauki.com/article/25265
Нашли грубую ошибку (плагиат, фальсифицированные данные или иные нарушения научно-издательской этики) ?
- напишите письмо в редакцию журнала: zhurnal@vestnik-nauki.com