RESEARCH ON THE IMPACT OF ERRORS ON THE OPERATIONAL ACCURACY OF HYDRAULIC EXCAVATORS

Abstract: this paper focuses on developing a position kinematic model for the working equipment to evaluate how mechanical tolerances and hydraulic system latency affect precision control. Based on this, the study provides essential conclusions and recommendations for methods to enhance accuracy during excavation or UXO disposal operations.

Keywords: hydraulic excavator, kinematics, positioning accuracy, mechanical error, hydraulic system latency.

https://doi.org/10.24412/2712-8849-2026-598-1129-1139

1. Introduction. To establish a basis for calculations, research and input data were conducted on the Hitachi ZX270 excavator. In this equipment, the fields of power mechanics and precision control play an essential role, particularly the electro-hydraulic control systems, requiring rigorous research to meet the machine’s technical and tactical specifications. Figure 1. General structural diagram of the excavator.1- Engine and hydraulic pump, 2- Cabin, 3- Boom cylinder, 4- Boom,5- Bucket, 6- Arm (Dipper) cylinder, 7- Arm (Dipper), 8- Bucket cylinder,9- Idler,10- Track roller, 11- Carrier roller, 12- Drive sprocket.Studying the kinematics of the digging process and the factors influencing its accuracy is an urgent task that serves as a foundation for evaluating and proposing methods to improve machine precision. While the Denavit-Hartenberg and Craig methods are widely used and provide comprehensive data on position, velocity, and acceleration, they are limited in evaluating the coordinate deviation of the bucket teeth or the specific impact of mechanical errors and hydraulic latency. Consequently, this paper utilizes the analytic geometry method. 2. Kinematic modeling assumptions. The following assumptions are made for the position kinematic model of the working equipment: 1. The machine is stationary on a horizontal, perfectly rigid ground, all links are considered perfectly rigid. The working equipment is treated as a planar mechanism, its spatial motion is determined solely by the platform’s rotation around the y-axis by an angle θ. 2. Link lengths are based on nominal values, excluding manufacturing tolerances. 3. The hydraulic cylinders (4, 5, 6) operate as reciprocating translational motion of the rods (7, 8, 9) along their respective link guides. 4. The effects of digging resistance and joint friction on the generalized coordinates are not considered. 3. Kinematic model construction. Based on the established assumptions, the following kinematic scheme is utilized to calculate the position kinematics of the excavators working equipment: Figure 2. Kinematic scheme of the excavator working equipment.1 - Boom, 2 - Arm (Dipper), 3 - Bucket, 4, 5, 6 - Hydraulic cylinders,7, 8, 9 - Piston rods, 10 - Support link (Stay bar), 11 - Push link (Bucket link).The operating mechanism of the excavator working equipment is a closed-loop system consisting of sequential individual motion groups. The changes in link positions are established through position (coordinate) equations. The scheme in Figure 2 represents a planar model of the excavation process, where the position of the working equipment at any given moment is characterized by coordinates within the Oxy system. This planar model is based on the structural-kinematic linkages of the longitudinal cross-section, representing the characteristic geometric features of the working equipment. Accordingly, the generalized coordinates of the excavator working equipment kinematic chain depend on four factors: 1. The swing angle θ of the turntable assembly around the vertical axis, 2. The linear coordinate s1, characterizing the displacement of rod 7 within hydraulic cylinder 4, 3. The linear coordinate s2, characterizing the displacement of rod 8 within hydraulic cylinder 5, 4. The linear coordinate s3, characterizing the displacement of rod 9 within hydraulic cylinder 6, Consequently, the position of the excavator bucket is defined as a function f = f(θ, s1, s2, s1). Within the scope of this paper, the model is constructed and determined based on a planar mechanism, neglecting the influence of the coordinate θ. 4. Establishing kinematic equations. To solve the position kinematic problem for the boom assembly of the excavators working equipment, links 1, 7, and 4 are first considered as a closed kinematic chain. The closed vector loop A-C-B is treated as a triangle where the length of side CB varies as a function of the generalized coordinate s1. The kinematic calculation scheme for links 1, 7, and 4 is illustrated in Figure 3. Figure 3. Kinematic calculation scheme for links 1, 7, and 4. The position of boom 1 within a fixed coordinate system attached to the turntable is defined by angle φ during the construction of the mathematical model. The relative position between kinematic pairs A and B is characterized by angle ψ and is a constant value. Angle β is a function of the generalized coordinate s1 and is derived from triangle ACB. The center coordinates of the revolute kinematic pair C, which connects boom 1 and rod 7 of hydraulic cylinder 4, depend on angle ?: ??=?−???.??????=?+???.sin? (1).The coordinates of joint center D, which connects boom 1 to arm 2, are determined based on angles γ and ς derived from the actual machine structure and are dependent on the coordinates of point C. &??=??−???.????&??=??+???.???? (2).The coordinates of point E are determined through the coordinates of point C of boom 1 and the distances LCD, LCE, the angles η, φ,ς and the angle ξ according to the machines structure. &??=??−???.????&??=??+???.???? (3).The determination of the positions of the points within the linkages of links 5, 8, 2 and links 6, 9, 10, 11, 3 is applied similarly, taking into account the generalized coordinates s2 and s3. 5. Determining bucket tooth tip position error: Point Q. The determination of the motion error for the work equipments planar mechanism is conducted according to the kinematic calculation scheme, ranging from boom link 1 to bucket link 3, using the parameter analysis method (max-min method). This calculation is performed taking into account the system of mechanical errors and the latency of the hydraulic system. Only geometric errors are considered, without accounting for the dynamics of the generalized coordinates. In Figure 3, a closed loop A-C-B of links 1, 7, and 4 is taken as a typical case to determine the deviation using the parameter analysis method. Their maximum deviations are added to the nominal dimensions of the links. Based on these calculations, new positions A1-C1-B1 are constructed for the case where the nominal dimensions of all links are increased to their maximum due to deviation, and A2-C2-B2 for the case where all links in the kinematic chain have their nominal dimensions reduced to the maximum due to deviation. The function f=f(s1, LAC + ΔLAC,Ls1 +ΔLs1) of point C1 belonging to triangle A1- C1- B1 is related to the position function of point C belonging to triangle A-B-C as follows: &??1=??+Δ??1&??1=??+Δ??1 (4).For triangle A2- C2- B2, the relationship to the position function of point C within triangle A-B-C is as follows: &??2=??−Δ??2&??2=??−Δ??2 (5).The region in which point C falls along the horizontal and vertical axes can be calculated as follows: &ℎ??=Δ??1+Δ??2&ℎ??=Δ??1+Δ??2 (6).The region in which points D, E, Q, and other points belonging to the remaining kinematic chains fall is determined similarly to equation (6), taking into account the generalized coordinates s2 and s3. The position calculations for the kinematic chain of the machines work equipment, accounting for errors during the link manufacturing process, were performed using the Matlab software package. To evaluate the position deviation of point Q (defined as the bucket tooth tip) due to the influence of mechanical errors and hydraulic system latency. The displacement latency of the hydraulic cylinders and mechanical linkage errors depend on many factors, in this case, we consider the assumed parameters as shown in Table 1 and Table 2 below. Table 1. Displacement latency of the hydraulic cylinders. Table 2. Mechanical linkage system errors on the working equipment. For each excavation method used to achieve a given set of coordinates with multiple possible values, to evaluate the position deviation, we specifically consider cases corresponding to different given generalized coordinates according to Table 3 below: Table 3. Control parameters and corresponding latencies for different excavation methods. The results of the position deviation of point Q (bucket tooth tip) under the influence of mechanical system errors and hydraulic latency for different excavation methods are obtained as shown in the graphs below: Figure 4. Arm excavation. Figure 5. Bucket excavation. Figure 6. Combined boom and arm excavation. Figure 7. Combined boom, arm, and bucket excavation. Conclusion and analysis of results. The obtained results demonstrate that during the operation of the working equipment, even minor mechanical deviations or small hydraulic latencies can lead to significantly large position errors at the end-effector (the bucket tooth tip, point Q). Consequently, it becomes difficult to maintain precise control over the position of the bucket tooth tip-or in other words, the overall accuracy of the excavation process. This poses a substantial impact on operational safety, particularly during the specialized tasks and working conditions characteristic of this machinery. 6. Conclusions. Based on the mathematical model results, a defined area is obtained where the bucket tooth tip may reside within the range of possible errors occurring during the movement of all links in the kinematic chain, from maximum to minimum. To improve the accuracy of the working equipment for the Hitachi ZX270 excavator in particular, and hydraulic excavators in general-thereby increasing the precision of bucket excavation-the following solutions are proposed: Manufacturing and component precision: The first approach to address low excavation accuracy is to increase the precision of the manufactured linkages and the operational accuracy of the hydraulic cylinders. However, this method will inevitably lead to a significant increase in the cost of machine components. Optimal control methods: The second approach is to select a rational control method that ensures the required accuracy without altering the excavators design. This method is considered more favorable as it does not require substantial costs and can be implemented on existing equipment through specialized control programming.


Полная версия статьи PDF

Номер журнала «Вестник науки» № 5 (98) том 2


Ссылка для цитирования:

Ha Dang Tuan, Phung Ba Dai RESEARCH ON THE IMPACT OF ERRORS ON THE OPERATIONAL ACCURACY OF HYDRAULIC EXCAVATORS // Журнал «Вестник науки» от 10 мая 2026 г. № 5 (98) том 2. С. 1129 - 1139. 2026 г. ISSN 2712-8849 // Электронный ресурс: https://www.вестник-науки.рф/article/30295 (дата обращения: 29.11.2026 г.)


Альтернативная ссылка латинскими символами: vestnik-nauki.com/article/30295



Нашли грубую ошибку (плагиат, фальсифицированные данные или иные нарушения научно-издательской этики) ?
- напишите письмо в редакцию журнала: zhurnal@vestnik-nauki.com


Вестник науки © 2026.    16+




* В выпусках журнала могут упоминаться организации (Meta, Facebook, Instagram) в отношении которых судом принято вступившее в законную силу решение о ликвидации или запрете деятельности по основаниям, предусмотренным Федеральным законом от 25 июля 2002 года № 114-ФЗ «О противодействии экстремистской деятельности» (далее - Федеральный закон «О противодействии экстремистской деятельности»), или об организации, включенной в опубликованный единый федеральный список организаций, в том числе иностранных и международных организаций, признанных в соответствии с законодательством Российской Федерации террористическими, без указания на то, что соответствующее общественное объединение или иная организация ликвидированы или их деятельность запрещена.