DESIGN STUDY OF AN INTEGRATED WORK PLATFORM FOR THE SANDVIK DT621 TUNNEL JUMBO

Abstract: this study proposes the design of an integrated work platform for the Sandvik DT621 tunnel jumbo to expand the working range at the tunnel face. The proposed platform is capable of vertical lifting and lowering, longitudinal movement, and lateral adjustment, with dimensions of 1.2 × 1.0 m and a design load of 9.0 kN. The structural components and actuating mechanisms were designed and calculated, and their performance was verified using the finite element method in ANSYS. The results indicate that the work platform and its actuating mechanisms satisfy the required strength, stiffness, and stability criteria under the design loading conditions.

Keywords: Sandvik DT621, integrated work platform, tunnel jumbo, ANSYS, finite element analysis, structural strength, stiffness, stability.

https://doi.org/10.68367/33209

1. INTRODUCTION In tunnel construction using the drill-and-blast method, the mechanization of drilling and auxiliary operations at the tunnel face contributes to improved productivity and working conditions [1], [3]. The Sandvik DT621 tunnel jumbo is a self-propelled two-boom drilling machine with a tunnel-face coverage of approximately 49 m² [2]. However, the original machine configuration has limitations in terms of working height and accessibility to locations on the tunnel crown and along the tunnel-face perimeter. Therefore, this study proposes integrating a work platform onto the DT621 to expand the working range while ensuring that machine operation is not adversely affected and that the required strength, stiffness, and stability are maintained. The objective of this study is to select a suitable configuration, perform the design calculations, and verify the operating capability of the integrated work platform on the DT621. 2. CONFIGURATION SELECTION AND DESIGN MODEL. 2.1. Configuration Selection. Three configurations were considered: a fixed platform, a lifting platform, and a lifting platform combined with longitudinal and lateral movement. The configurations were evaluated in terms of working range, mobility, safety, and compatibility with the DT621. The fixed-platform configuration has a simple structure but provides a limited working range. The lifting-platform configuration improves accessibility in the vertical direction but remains limited in terms of horizontal movement. The lifting platform combined with longitudinal and lateral movement provides an extended working range and can be retracted during machine travel, therefore, this configuration was selected as the basis for the design. The proposed configuration consists of a platform deck, safety guardrails, a platform-supporting frame, a lifting mechanism, a longitudinal movement mechanism, and a lateral adjustment mechanism. During operation, the platform is raised to the required elevation, moved to the working position, and laterally adjusted to access the required area. After completion of the operation, the system is returned to its retracted position. 2.2. Main Design Parameters. The work platform has dimensions of 1.2 × 1.0 m and a floor area of 1.2 m². The maximum working height is approximately 4.0 m, with a lifting stroke of 2.5 m, a longitudinal travel of 3.0 m, and a lateral adjustment of 1.2 m. The guardrail height is 1.1 m, and the platform is designed to accommodate a maximum of two operators simultaneously. These parameters were selected to meet the requirements for accessing the tunnel crown and tunnel-face perimeter while ensuring that the platform can be retracted and does not interfere with the operating range of the two drilling booms [2]. 3. STRUCTURAL AND ACTUATING MECHANISM DESIGN CALCULATIONS. 3.1. Load Determination. The standard load acting on the platform consists of the self-weight, operator load, and the weight of tools and materials [6]: G = Gₛ + Gₙg + Gd = 6,4 kN. With a load factor of γ = 1.3, the design load is determined as: Pₜₜ = γG = 1,3 × 6,4 = 8,32 kN. For consistency in the design calculations, the design load is selected as: Pₜₜ = 9,0 kN. For a platform area of: Aₛ = 1,2 × 1,0 = 1,2 m². The uniformly distributed design load is: qₜₜ = Pₜₜ/Aₛ = 9,0/1,2 = 7,5 kN/m². 3.2. Platform Frame Design. The platform deck is made of 5-mm thick anti-slip chequered steel plate. The supporting frame consists of two main longitudinal beams and transverse beams. Assuming that the load is uniformly distributed between the two longitudinal beams: P₁ = 9,0/2 = 4,5 kN. For: l₁ = 1,2 m: the uniformly distributed load is: q₁ = 4,5/1,2 = 3,75 kN/m. The maximum bending moment is: Mₘₐₓ = q₁l₁²/8 = 0,675 kN·m. The longitudinal beams use 60 × 40 × 4 mm rectangular hollow sections, while the transverse beams use 40 × 40 × 3 mm rectangular hollow sections. The cross-sections were selected based on strength and stiffness checks of the platform frame [7]. 3.3. Lifting, Movement Mechanisms and Hydraulic System. The lifting mechanism uses a hydraulic cylinder acting on the platform-supporting beam. The longitudinal movement mechanism employs guideways and an actuating hydraulic cylinder, while the lateral adjustment mechanism provides rotational movement about a vertical post. For the rotary mechanism, in addition to the vertical load, an equivalent horizontal force generated by the operators is considered. For two operators, the total operator load is: Gₙg = 2 × 0,8 = 1,6 kN. The design horizontal force is selected as: Fₙ = 1,0 kN. The moment acting on the rotary axis is: Mₙ = FₙR = 1,0 × 6,0 = 6,0 kN·m. An independent hydraulic power source is provided for the platform mechanisms to minimize interference with the original hydraulic system of the DT621. The hydraulic lines are routed along the machine frame and platform-supporting beam and are equipped with clamps, supports, and protective covers where necessary. The system is also equipped with control devices and an emergency stop button to control the operating process [5]. 4. STRENGTH, STIFFNESS AND STABILITY VERIFICATION. 4.1. Analysis of the Work Platform Mechanism. A finite element model of the mechanism was analyzed using ANSYS under the design load Pₜₜ = 9,0 kN. The von Mises equivalent stress distribution shows that the highest stress concentrations occur at the boom base and connection locations, which are regions characterized by changes in structural stiffness and load-transfer conditions. According to the analysis results, the maximum stress in the mechanism is approximately 105.2 MPa, which is lower than the yield strength of CT3 steel, 235 MPa, corresponding to a safety factor of approximately 2.23. The maximum displacement is approximately 18.06 mm, occurring at the boom-head region. Therefore, under the design loading condition, the mechanism satisfies the strength and stiffness requirements of the analyzed model. Figure 1. Strength and stress analysis results of the work platform mechanism. 4.2. Analysis of the Work Platform. For the work-platform model alone, the design load Pₜₜ = 9,0 kN is distributed over the entire platform deck. The ANSYS analysis results are shown in Figure 2. The maximum von Mises stress is approximately 82.6 MPa, concentrated at the frame connection nodes and corners. This value is lower than the yield strength of CT3 steel, 235 MPa, corresponding to a safety factor of approximately 2.85. The maximum total displacement of the platform is approximately 1.37 mm, concentrated in the loaded deck area. The analysis results indicate that the platform frame satisfies the strength and stiffness requirements under the design loading condition. Figure 2. Strength and stress analysis results of the work platform. 4. CONCLUSIONS. This study proposed an integrated work platform combining lifting, longitudinal movement, and lateral adjustment for the Sandvik DT621 tunnel jumbo. The proposed configuration is intended to expand access to the tunnel crown and tunnel-face perimeter while ensuring that the platform can be retracted and does not interfere with the operating range of the two drilling booms. Under the design load of Pₜₜ = 9,0 kN the calculation results indicate that the platform structure and actuating mechanisms satisfy the design requirements. ANSYS analysis of the mechanism yielded a maximum stress of 105.2 MPa, a safety factor of 2.23, and a maximum displacement of 18.06 mm. For the work platform alone, the maximum stress was 82.6 MPa, the safety factor was 2.85, and the maximum displacement was 1.37 mm. The overall stability factor was 4.30 > 1.5. Within the conditions and assumptions adopted in the calculations, the proposed configuration satisfies the requirements for strength, stiffness, and stability, providing a technical basis for further design development, fabrication, and installation of the work platform on the DT621. During operation, the machine must remain stable on the supporting ground, must not be moved while the platform is in operation, and the design load of Pₜₜ = 9,0 kN must not be exceeded.


Полная версия статьи PDF

Номер журнала «Вестник науки» № 9 (102) том 4


Ссылка для цитирования:

Nguyen Duy Thanh, Huynh Thi Thuy Huong DESIGN STUDY OF AN INTEGRATED WORK PLATFORM FOR THE SANDVIK DT621 TUNNEL JUMBO // Журнал «Вестник науки» от 27 сентября 2026 г. № 9 (102) том 4. С. 931 - 938. 2026 г. ISSN 2712-8849 // Электронный ресурс: https://www.вестник-науки.рф/article/33209 (дата обращения: 18.11.2026 г.)


Альтернативная ссылка латинскими символами: vestnik-nauki.com/article/33209



Нашли грубую ошибку (плагиат, фальсифицированные данные или иные нарушения научно-издательской этики) ?
- напишите письмо в редакцию журнала: zhurnal@vestnik-nauki.com


Вестник науки © 2026.    16+




* В выпусках журнала могут упоминаться организации (Meta, Facebook, Instagram) в отношении которых судом принято вступившее в законную силу решение о ликвидации или запрете деятельности по основаниям, предусмотренным Федеральным законом от 25 июля 2002 года № 114-ФЗ «О противодействии экстремистской деятельности» (далее - Федеральный закон «О противодействии экстремистской деятельности»), или об организации, включенной в опубликованный единый федеральный список организаций, в том числе иностранных и международных организаций, признанных в соответствии с законодательством Российской Федерации террористическими, без указания на то, что соответствующее общественное объединение или иная организация ликвидированы или их деятельность запрещена.